Before we look back at 2011, here is a look at the facilities and projects that are scheduled to (or may) happen in 2012.
Work will begin to close the gap between the Anacostia Tributary Trail System in Maryland and DC's Anacostia Riverwalk trail. This is the Kenilworth section of the ART. I also expect the two ART bridges over the railroad tracks to be finished in 2012 as well.
Capital Bikeshare expansion in DC, Rockville, Arlington, and Alexandria
Work might begin on a ramp to replace the stairs that connect the Metropolitan Branch Trail to L Street NE and on the Rhode Island Avenue Metro bridge.
The Downtown BID will organize the Freedom Plaza BTWD event.
The Potomac Power Generating Station along the MVT will be closed.
DC plans to add 4 miles of bike lane that is ready to go (and possibly more) and Arlington will extend bike lanes on Crystal Drive.
Arlington might build the portion of the proposed cycletrack along Army Navy Drive/Joyce Street that is under I-395; start the Washington Boulevard Bridge over Columbia Pike and complete the improved Glebe Road bridge over Arlington Blvd. The trail on the west side of Arlington/Washington Blvd will be extended to Columbia Pike and work could begin on the Route 110 Trail.
More bike parking at the Rosslyn Metro.
The 2012 Rails-to-Trails Sojourn will once again be along the C&O/GAP route from DC to Pittsburgh.
Also, "Premium Rush" on August 24.
Surely there is more that I've missed.
Recent Comments