FABB reports that VDOT is going to complete the new bridge before tearing down the old one.
We were assured that the new trail bridge would be built before the old one is removed, and that there would be a very short period during which traffic from the old bridge would be switched to the new one. Since the new bridge will be offset from the old one, there will be a gradual curve approaching and exiting the bridge from the trail.
Comments