« Action Alert: DDOT Backtracking on L & M Street Cycletracks | Main | MD promotes awareness of road safety among motorists, cyclists and pedestrians »

Comments

Feed You can follow this conversation by subscribing to the comment feed for this post.

On the W&OD this past Saturday, I think between Sterling and Ashburn, I noticed a new bridge being built above the trail. An illuminated sign warned, "SETTING STEEL, EXPECT DELAYS" with, IIRC, dates of 06-27 to 07-05. Anyone know what that's about?

Sorry I'm not more specific. I should have written down the exact location or at least taken a picture or something.

Ah, it must be this:

http://wandodtrailreport.blogspot.com/2011/06/atlantic-boulevard-overpass.html

I was looking up Pacific avenue, but that already has a bridge.

The comments to this entry are closed.

Banner design by creativecouchdesigns.com

City Paper's Best Local Bike Blog 2009

Categories

 Subscribe in a reader