« Action Alert: DDOT Backtracking on L & M Street Cycletracks | Main | MD promotes awareness of road safety among motorists, cyclists and pedestrians »
You can follow this conversation by subscribing to the comment feed for this post.
The comments to this entry are closed.
Banner design by creativecouchdesigns.com
City Paper's Best Local Bike Blog 2009
On the W&OD this past Saturday, I think between Sterling and Ashburn, I noticed a new bridge being built above the trail. An illuminated sign warned, "SETTING STEEL, EXPECT DELAYS" with, IIRC, dates of 06-27 to 07-05. Anyone know what that's about?
Sorry I'm not more specific. I should have written down the exact location or at least taken a picture or something.
Posted by: antibozo | June 27, 2011 at 11:30 PM
Ah, it must be this:
http://wandodtrailreport.blogspot.com/2011/06/atlantic-boulevard-overpass.html
Posted by: antibozo | June 27, 2011 at 11:56 PM
I was looking up Pacific avenue, but that already has a bridge.
Posted by: washcycle | June 28, 2011 at 12:01 AM