« Future Osprey Bridge | Main | Monday Morning Commute - 11,368 »

Comments

Feed You can follow this conversation by subscribing to the comment feed for this post.

Nice. Hopefully the nasty waterfall has stopped dripping too. And the toxic dust storm has abated.

Anyone know if on same side, the ART under East Capitol bridge is open--was closed last year and prevented a continuous trail from Benning to South Capitol

It's open.

Though this morning (wed 17 Apr) they had the barrier across the north (Penn Ave) side of the path, (collapsed on one side however) but a break in the barrier for the road. The south side had the road completely closed but the path open.

The comments to this entry are closed.

Banner design by creativecouchdesigns.com

City Paper's Best Local Bike Blog 2009

Categories

 Subscribe in a reader