« White Oak's first delineated bike lanes | Main | CWL 2020: #12 Long Branch »

Comments

Feed You can follow this conversation by subscribing to the comment feed for this post.

I've been meaning to check with DDOT and PG to see what plans they have to improve the ECGW connection from NE DC to the Anacostia Trails. The on street route along Varnum and and Alison east of Eastern Ave could use improvement.

Great idea - I support the return of CWL! I came across a report recently that recommended connecting the Paint Branch and Indian Creek trails along the Greenbelt Rd/University Ave corridor. I think it was from a study of the Greenbelt Rd corridor in the Beltway Plaza area.

This is the report I was talking about. Technically this would be a connection between corridor trails and does not follow one of the tributaries so I don't know if it fits in your framework. The report also suggests an overpass over Kenilworth Rd between Berwyn Heights and Greenbelt Park. "Creating a Future for
Greenbelt Road/MD-193" - https://washington.uli.org/wp-content/uploads/sites/15/2018/10/Greenbelt-TAP-Report-Final-100118.pdf

Verify your Comment

Previewing your Comment

This is only a preview. Your comment has not yet been posted.

Working...
Your comment could not be posted. Error type:
Your comment has been posted. Post another comment

The letters and numbers you entered did not match the image. Please try again.

As a final step before posting your comment, enter the letters and numbers you see in the image below. This prevents automated programs from posting comments.

Having trouble reading this image? View an alternate.

Working...

Post a comment

Your Information

(Name and email address are required. Email address will not be displayed with the comment.)

Banner design by creativecouchdesigns.com

City Paper's Best Local Bike Blog 2009

Categories

 Subscribe in a reader